OUR SERVICES

PLANNING

We carry out the planning works which serves as a base for the production of the metal construction.

CONSTRUCTION

We build metal structures as well as reinforced concrete buildings.

PLANNING

We carry out the planning
works, according to which
the metal construction is
started to be produced.

INCLUSION OF
CONSTRUCTION

We import the metal
construction from our
partners abroad, which
is prepared according to
the given project.

CONSTRUCTION

We build metal structures
as well as reinforced
concrete buildings.

METAL STRUCTURE
ASSEMBLY

Our professional team will
quickly assemble the
structure in any
weather conditions.

INCLUSION OF
CONSTRUCTION

We import the metal construction from our partners abroad, which is custom made.

METAL STRUCTURE
ASSEMBLY

Our professional team will quickly assemble the structure in any weather conditions.

ABOUT US

Metal Buildings LLC established in 2017 in Armenia,
performs construction and is a supplier offering total
solutions for PEB (Pre-Engineered Steel Buildings),
including design, and supply, using internationally
recognized engineering codes and
software and advanced production equipment.
The high quality of structures, innovation and
professionalism are guarantees for any construction
system built by us.

With our light steel structures, you will save up to 30%
compared to conventional construction materials used
for houses or other edifices.
The warranty period of Pre-engineered building is 20
years given by the manufacturers.

ABOUT US

Metal Buildings LLC established in 2017 in
Armenia, performs construction and is a
supplier offering total solutions for PEB
(Pre-Engineered Steel Buildings),
including design, and supply, using internationally recognized engineering codes and software and advanced production equipment.

The high quality of structures, innovation
and professionalism are guarantees for
any construction system built by us. With our light steel structures, you will
save up to 30% compared to
conventional construction materials used
for houses or other edifices.

The warranty period of Pre-engineered building is 20 years given by the manufacturers.

ADVANTAGES OF METAL CONSTRUCTION

LESS EXECUTION TIME PERIOD

The light steel structure requires a considerably
reduced execution time compared to a classic structure.

EARTHQUAKE PROOF

As there are aspects to be taken into consideration, the
elements provided have certifications and tests on them.

LESS EXECUTION TIME PERIOD

The light steel structure requires a considerably
reduced execution time compared to a classic structure.

VERSATILITY in CONSTRUCTION

Easy to execute any kind of building regardless of the field of activity that will be intended for.

INSTALLATION in ANY SEASON

Due to the fact that the light steel structure is pre-assembled, it can be installed in cold seasons too, without special measures.

EARTHQUAKE PROOF

As there are aspects to be taken into consideration, the elements provided have certifications and tests on them.

THERMAL and PHONIC COMFORT

Wall systems with the highest thermal and sound insulation values, according to the obtained certifications.

BEST PRICE / QUALITY RATIO

Considering that these type of constructions require lower maintenance costs and their durability over time, it results in the best price-quality ratio.

VERSATILITY in CONSTRUCTION

Easy to execute any kind of building regardless of
the field of activity that will be intended for.

THERMAL and PHONIC COMFORT

Wall systems with the highest thermal and sound
insulation values, according to the obtained certifications.

INSTALLATION in ANY SEASON

Due to the fact that the light steel structure is pre-assembled, it can be installed in cold seasons too, without special measures.

BEST PRICE / QUALITY RATIO

Considering that these type of constructions require lower maintenance costs and their durability over time, it results in the best price-quality ratio.

OUR PROJECTS

DARGETT BREWERY

Armenia, Yerevan Sevan Motorway, 10/5 Building

According to the project, the constructions were produced in the Emirates,
imported and built by Metal Buildings in 2017.

FoodPark by Downtown

Armenia, Yerevan Isakov 11

The facade of the old Soviet building was demolished according to our project,
strengthening and an innovative renovation of the exterior was done with the
help of metal tents (shutters).
An open stadium was added to the roof of the building.

PUSHKINO FOOD COURT

Russia. Mosckow, Pushkino willage, food court

The project design and working drawings was done by us (Metal Buildings).

Contact Us

Contact Us